Step 1: Assemble E-frame
Screw the three lumber “arms” to the fourth base piece. Assemble them in the shape of an “E” – one on each end and then the centre. For extra stability, glue with Selleys Aquadhere Durabond
Step 2: Make your mark
Use your stud finder to locate two areas where the desk can be supported – one at the side and one at the back. Mark it out with a pencil and spirit level.
Step 3: Attach your supports
Place the E-frame against the wall and screw them in at the stud marks with screws that are at least 65mm in size. Fasten additional screws to the wall evenly along the frame.
Step 4: Assemble your surface
Place the desk surface panel/s on top of a plywood base to create one surface panel. If the fit is good, glue it in place. Use 12mm screws in the back of the plywood. Sand the surface and edges down.
Step 5: Install your desk
Place the desk surface on top of the E-frame and nail into place. Then secure the trim piece to the front of the desk with Selleys Liquid Nails Fast Grab.
Share
Share this article with your friends